Flow Test for Green Drainage Infrastructure
The main objective of this service is to conduct a flow test to validate the proper hydraulic and structural operation of a green drainage infrastructure (GDI).
Flow Test for Green Drainage Infrastructure
This test will:
- Verify the flow of water from the stream to the GDI inlet points.
- Check the internal leveling of the GDI to maximize retention capacity.
- Validate the planned overflow point (lowered curb or overflow sump).
- Observe the accumulation of residual water in the stream after the test.
- Assess compaction and substrate quality through infiltration.
A maintenance partner who knows your reality
Our interventions are designed to extend the lifespan of your spaces while guaranteeing a high level of safety and performance.

